- Overview
- Company Profile
- Our Advantages
- Certifications
- Packaging & Shipping
Basic Info.
Model NO.
MY-CL-02
Usage
High Cleanliness
Customized
Customized
Class
Class 100
Application
100 Lab /Lab Clean Room
Core Components
Door, Doors and Windows
Product Name
Pharmaceutical Modular Cleanroom Project
Color
White, Blue, Green
HVAC Supply Scope
Including Ahu, Chiller, Dehumidifier, Ducting, Et
Structure Supply Scope
Including Panels, Windows, Doors, Fittings, Floori
Auto-Control Supply Scope
PLC Controller, Sensors for Humidity &Temperature
Electric Supply Scope
Lighting, Switch, Cables, Wires, etc
Equipment Supply
Air Shower, Pass Box, Weighing Booth, Isolator
Qualification Documents
Dq, Iq, Oq, Pq
Transport Package
Wooden Case Packaging
Specification
Customized
Trademark
MARYA
Origin
China
HS Code
9406900090
Production Capacity
50000PCS/Year
Packaging & Delivery
Package Size
260.00cm * 90.00cm * 230.00cm
Package Gross Weight
50.000kg
Product Description
Product Overview
Professional EPC Supplier of Pharmaceutical Electronics Food Cosmetics Cleanroom
1) 30 years' experience in clean room area;
2) Clean room turnkey service scope: including design, manufacturing, construction, commission, training and after-sale service;
3) Clean room cosntruction standard(GMP): Class 100-100000; ISO 5-8; Class B-D
4) Customization of clean room: Costomer only need to prepare the land, steel structure, water/ electricity supply, etc
5) Leadtime of clean room project from design to construction:
Design: about 20-30 days;
Manufacture: about 1 month;
Construction: 3-6 months according to site condtions and area.
FEATURES AT A GLANCE
2) Clean room turnkey service scope: including design, manufacturing, construction, commission, training and after-sale service;
3) Clean room cosntruction standard(GMP): Class 100-100000; ISO 5-8; Class B-D
4) Customization of clean room: Costomer only need to prepare the land, steel structure, water/ electricity supply, etc
5) Leadtime of clean room project from design to construction:
Design: about 20-30 days;
Manufacture: about 1 month;
Construction: 3-6 months according to site condtions and area.
FEATURES AT A GLANCE
>Made:Modular wall and ceiling sandwich panel of cleanroom project
-Machine -made economical sandwich panel
-Hand-made modular sandwich panel
> Skin:
- Pre-painted galvanized steel (PPGI) skin
-HPL(Melamine high pressure laminate) skin
> Core insulation material:
-EPS(Expanded polystyrene)
-PUF (Polyurethane foam)
-Rock wool (mineral wool)
-Paper or aluminum honeycomb
-With magnesium gypsum board
-Machine -made economical sandwich panel
-Hand-made modular sandwich panel
> Skin:
- Pre-painted galvanized steel (PPGI) skin
-HPL(Melamine high pressure laminate) skin
> Core insulation material:
-EPS(Expanded polystyrene)
-PUF (Polyurethane foam)
-Rock wool (mineral wool)
-Paper or aluminum honeycomb
-With magnesium gypsum board
PRODUCT SPECIFICATIONS
Product Name | 40/50 paper cellular warehouse board | 40/50 aluminum cellular warehouse board | 40/50 PU warehouse board | 50 mineral wool warehouse board |
The biggest height of baffle board | 8000mm | 8000mm | 6000mm | 5700mm |
The biggest length of ceiling | 6000mm | 6000mm | 4500mm | 3600mm |
Board width | ≤1200mm | ≤1200mm | ≤1200mm | ≤1200mm |
Thickness of color steel board | 0.45-0.60mm | 0.45-0.60mm | 0.50-0.60mm | 0.50-0.60mm |
Surface material | Color steel board/antistatic color steel board/stainless steel board | |||
Note | Warehouse boards and embedded wire pipes are available upon the customer's requests |
Cleanroom project doors:-Alu frame panel doors
-Flush type steel skin doors
-HPL skin doors
-Stainless steel doors
-Auto sliding door
-Emergency door
Cleanroom project windows:
-Flush type double glass window
-Alu frame double glass window
-Single glass window
Alu profile coving, corner, hangling and connection system HVAC System of cleanroom project:
HVAC design and room data: according to ISO14644-1 and CFR209E cleanliness class
Chiller system of cleanroom project:- Air cooling chiller
-Water cooling chiller
Air handling unit (AHU)
Humidifier or dehumidifier
Air supply ducts
HEPA filter box
Air return and air exhaust ducts
Diffuser, grills, valves, damper and louver, fan etc
Flooring System of cleanroom project:Epoxy self-leveling flooring:
-Solvent-free type,
-Solvent type
PVC floor:
Antistatic type
Different color is available for different classification if required.
Lighting and Electricity System of cleanroom project:Clean room lighting:
Flush type light fixture
Extrude light fixture
White-enamelled steel
Stainless steel light
Clean room telephone
Cleanroom project Accessory Equipments:Static pass through box
Dynamic pass through box
Air shower
Sampling and weighing booth
Laminar air flow/FFU
Gowning lockers and benches
Wash sink
Hand disinfector and dryer
-Alu frame double glass window
-Single glass window
Alu profile coving, corner, hangling and connection system HVAC System of cleanroom project:
HVAC design and room data: according to ISO14644-1 and CFR209E cleanliness class
Chiller system of cleanroom project:- Air cooling chiller
-Water cooling chiller
Air handling unit (AHU)
Humidifier or dehumidifier
Air supply ducts
HEPA filter box
Air return and air exhaust ducts
Diffuser, grills, valves, damper and louver, fan etc
Flooring System of cleanroom project:Epoxy self-leveling flooring:
-Solvent-free type,
-Solvent type
PVC floor:
Antistatic type
Different color is available for different classification if required.
Lighting and Electricity System of cleanroom project:Clean room lighting:
Flush type light fixture
Extrude light fixture
White-enamelled steel
Stainless steel light
Clean room telephone
Cleanroom project Accessory Equipments:Static pass through box
Dynamic pass through box
Air shower
Sampling and weighing booth
Laminar air flow/FFU
Gowning lockers and benches
Wash sink
Hand disinfector and dryer